Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the bridge domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/qg0eby8jd8b3/public_html/wp-includes/functions.php on line 6121
Norterra - M3 Metals

Norterra

Scope:Lobby Stair / 2nd Floor Balcony Furnish & Install Glass Guardrails
Contractor: Wespac
Architect: DAVIS
Client: Norterra
Location: Phoenix, Arizona

Lifting Office Spirits Staircase Lures Upwards

Crisp stainless steel guardrails frame the journey – rising up to arrive at an open glass guard railed balcony. Sweeping stainless guardrails and accents welcome one up and support floating tempered glass. Stainless steel posts, brackets, standoffs and top channel caps accent, aluminum base shoes and cladding.