Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the bridge domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/qg0eby8jd8b3/public_html/wp-includes/functions.php on line 6121
La Loma Independent Living - M3 Metals

La Loma Independent Living

Scope:Removing existing wrought iron and replacing with straight and radius glass infill on existing post.
Contractor: Sundt Construction
Architect & Designer: Thoma-Holec Design

Elegant Transformation – Remodel Radiance for 2020

Entirely new feel to same space, with refined aluminum handrails and glass accent infill panels. Using existing posts, this new elegant railing transformed space into today and forward.