Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the bridge domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/qg0eby8jd8b3/public_html/wp-includes/functions.php on line 6121
Chandler Corporate Center - M3 Metals

Chandler Corporate Center

Scope: Stringer and balcony mounted tempered glass guardrail with stainless steel satin cladding (94 linear feet).
Contractor: Steven Leinweber Construction
Architect: Butler Design Group
Location: Chandler, Arizona

Elegant and Eye-catching Entrance Staircase

Transparent, double-sided glass guardrail stairway glides upstairs from entrance lobby.

Modern refined accent metal pucks initiate wraparound handrails – inviting guests upward.